Thinking of drilling a borehole in Kenya? You might want to read this…
2 min readBoreholes are essentially the most basic sources of water in Kenya for companies, communities, and even individuals. Many people always ask, “Where do I start if I want a borehole in my homestead?” This article gives a brief of the steps and formalities to follow if you want to drill a borehole. Leave us a comment, we would like to hear more from you.
- Formalities :
- Geological/Hydrological Survey to be done by Registered Geologist.
- Getting Authorization from Water Resource Management Authority ( WRMA ) for drilling the borehole.
- Conducting Enviornment Impact Assessment ( EIA ) & getting Licence from NEMA.
- Getting No Objection Letter from Water Service Provider like Nairobi Water Company, Mavoko County Council etc.
- Actual Borehole Drilling Process :
- Drilling of 11”until loose top formation & installing 9” temporary casing then Drilling 8” up to recommended depth.
- Casing : Installation of 6” Casing pipe – Class – B ( 4.5mm thickness ) up to bottom . Generally ratio of Plain Casing & Screen casing is 70 : 30. but depends up on the hole drilled.
- Gravel Pack : Inserting 2-4mm natural gravel outside the casing and inside the open hole for artificial filtration.
- Borehole development : one need to do development by air jetting until water come out clean. Generally it is 3 hours but still depends up on the hole.
- Well head Slab : on the top 1mtr x 1 mtr x 1 mtr ( LBH) digging pit & then making slab by using Cement, Send and gravel in proper ration which will prevent the hole by contamination. Some time client like to have a manhole which will be under ground with metal cover , so that place will look like flat .
- Capping : fitting cap on the top until installation of pump etc.
- Test Pumping the borehole : For the measuring exact yield of the borehole one has to do test pumping i.e. pump out water continuously 24 hours , then one can know the yield of the well and the rest level & pumping water level etc. This is most important process to decide the size of pump.
- Do Chemical & Bacteriological analysis via government chemist to know the water is suitable for the domestic / industrial use or not. Here’s a list of laboratories that can help with that.
- Completion Report : preparing completion report ( Form 009 A ) as per WRMA rules & submit to the WRMA office as well as to the client.
- Installation of Pump for the borehole :
On the basis of test pump report one can decide the Pump Installation depth , and size of pump , motor, delivery pipe, cable , control panel, water meter and
other sundries.